Menu
  • HOME
  • ABOUT US
  • PRODUCTS
    • SOLAR PV ONGRID KITS
      • SOLAR PV ONGRID KITS DESCRIPTIONS
    • SOLAR PV HYBRID KITS
      • SOLAR ENERGY HYBRID KITS DESCRIPTION
    • SOLAR WATER PUMP KITS
    • SOLAR LED STREET LIGHTS
    • SOLAR VEHICAL CHARGING
    • SOLAR PV PANELS
  • SERVICES
    • EPC
    • CONSULTANT
    • TURNKEY
    • SURVEY FORMS
  • CONTACT US
×
  • HOME
  • ABOUT US
  • PRODUCTS
    • SOLAR PV ONGRID KITS
      • SOLAR PV ONGRID KITS DESCRIPTIONS
    • SOLAR PV HYBRID KITS
      • SOLAR ENERGY HYBRID KITS DESCRIPTION
    • SOLAR WATER PUMP KITS
    • SOLAR LED STREET LIGHTS
    • SOLAR VEHICAL CHARGING
    • SOLAR PV PANELS
  • SERVICES
    • EPC
    • CONSULTANT
    • TURNKEY
    • SURVEY FORMS
  • CONTACT US
×

Author: admin

Home / Articles posted by admin

2MW Solar PV Power Project Feasibility Study

April 19, 2017April 19, 2017 adminComment
2MW Solar PV Power Project Feasibility Study
SITECNO Group has completed the feasibility study of 2MW Solar PV Power project for Crystal Energy (Pvt) Limited. This is an IPP project on fixed FIT for 25 years. The feasibility study has been approved by AED. SITECNO is providing EPC services for this project.

10MW Solar PV Project Feasibility Study

April 19, 2017April 19, 2017 adminComment
10MW Solar PV Project Feasibility Study
SITECNO group has completed fesibility study of the 10MW PV Power project for Sun Power Pakistan. The project is IPP with feed in terrif. The feasibility has been approved by Alternate Energy Department. The project in under process of finnancial close.

About Us

SITECNO Group combines a number of system solutions for the efficient use of renewable energies under one roof and feels responsible to do its share to change global energy supplies to renewable and clean energy, based on SITECNO´s core competence in photovoltaics.

EnglishFrançaisDeutschPortuguêsEspañol

TWEETS

Something went wrong with the twitter.

CATAGORIES

  • projects

SOCIAL MEDIA LINKS

WordPress Theme: AccessPress Root by AccessPress Themes